Pages

Powered By Blogger

Friday, 5 June 2015

僵硬的判决 7June2015



僵硬的判决 7June2015
一位退休的公务员,在人生最清闲的时刻,没有好好的规划和管理自己的人生。 竟然对这么小的少女下手,不管他是用什么手段使这少女怀孕。 这都是犯罪和犯法罪恶行为。因为,后果是一样的。这是不像【人】行为。 理应该很重,很重, 很重的被惩罚,可是,我们的法官,很脑残,低能,既然可以判他无罪。 一点都不懂得变通。

法律是【死】的,人是活的。人却被死的法律活绑着。这法官的智慧是是看【一】不是【1】。是我对法律认知实在太少了吗?还是。。。。这国家的法律判决在我眼里,一直都是很荒谬的。明明白白就是一个大鲨鱼,却没法被提空。 所以,。。。。这国家。。。。是非常令人不安的。 法官们的一宗一宗判决是令人怔惊的。

一位60岁不年轻的男人,做出如此不像人的事,却被判无罪,这是很严重的问题。这是整个政治系统出了问题才会有的现象,这是令100-那个法官%感到愤怒的事。 这是跟1MDB的滥权贪污舞弊腐败一样让人愤怒的。只是所涉及的范围的大小而已。 这样子的法官,这么样子的领导者,部长们没有好好跟进的后果。正副首相,正副首长,部长们整天为什么事很忙呢? 

按照法律判决是绝对没有错,但是,判官的判决是要计算这罪行的严重破坏性。这么重的罪行这不年轻的男人所干下的恶行却是可以如此的不合逻辑的判决。 这是让人感到羞耻的判决。这是让人对法官们狭义的判断感到无限失望。感到人民的税金白养一群没有素质的白痴法官。 是的,我可以很肯定说我们人民对司法的信心很低。

我希望有一天,有的刑事案件,我们人民如果不满的判决也可以公投来做最后判定。

Saturday, 30 May 2015

Daro Hospital cries out loud for ambulance

Daro Hospital cries out loud for ambulance

Posted on May 17, 2015, Sunday
The chartered van is not designed for transporting patients, and the space inside the van is small.

DARO Hospital had three ambulances but for the past four months, we have to charter commercial vans, or ‘van sapu’, to send patients to Sibu Hospital as the three ambulances have malfunctioned and cannot be repaired.

This problem has been there for the past two years. We were promised new ambulances since a year ago but until now, there is nothing. Those three ambulances are already old and the hospital has already requested for new ambulances from the Healthy Ministry and the Health Department but to no avail.

The ambulances broke down almost every day until four months ago when they were unable to be repaired any longer. They should have been replaced when they started to malfunction, not until they were completely unable to be repaired. Instead, we were given a new hearse (Van Jenazah) and a Toyota Fortuner vehicle for official use but no ambulance. We know that nearby hospitals such as Mukah Hospital has brand new ambulances.

So, for the past four months, we were forced to charter commercial van and boat to transfer patients to Sibu Hospital, which takes about three hours on bad road conditions. We have also requested to borrow ambulances from nearby hospitals like Sibu Hospital, but, until now, there is nothing. Daro Hospital is a small district hospital without any specialists and what we can do here is limited, so some patients need to be transferred to Sibu Hospital for further treatment.

What are the problems?
1. Commercial vans or boats are not designed to transport patients. There is no power supply inside as some of the equipment need constant electric supply like blood pressure monitoring, IV drip machine and suction machine.

2. The commercial van driver is not trained to transport patients compared to ambulance drivers, who have undergone some courses like defensive driving.

3. Most of the time, it takes time to find an available commercial van, and there is a delay in transferring patients to Sibu Hospital. In fact, there was a time where there was no commercial van available, and we had to charter ambulances from Rejang Medical Centre or KPJ Sibu Specialist. In cases like this, there will be a significant delay in transferring patients because it takes three hours from Sibu to Daro and another three hours from Daro to Sibu, so patients will only arrive at Sibu Hospital after six hours.

4. What if those commercial vans get involved in an accident? Remember that those commercial vans are not public or government transport. Is their life guaranteed in case of an accident? There will be doctors, nurses and medical officers inside the van to accompany the patient – what will happen to them?

5. There is no bed inside the van, unlike in an ambulance. It is very uncomfortable for the patient and the space inside the van is small.

6. The chartered van does not have a siren and it gets very hard during emergencies and traffic jams, and we have to wait just like everyone else.
Truthfully,

Concerned Citizen

Read more: http://www.theborneopost.com/2015/05/17/daro-hospital-cries-out-loud-for-ambulance/#ixzz3bcWWPWyp

Daro Hospital in endless predicament, now power and water

Daro Hospital in endless predicament, now power and water

by Peter Sibon, reporters@theborneopost.com. Posted on May 26, 2015, Tuesday
The map of Daro (circled) and its surrounding areas.
KUCHING: Daro Hospital appears to be facing endless predicaments. The first predicament they faced was the lack of ambulance services.

However, after it was highlighted by The Borneo Post recently, it was reported that Mukah Hospital would lend an ambulance and the Methodist Church would donate another one. And on top of that the hospital would be getting two new ones next year.

A concerned individual, who has become the source for The Borneo Post to highlight the predicaments faced by Daro Hospital on the absence of proper ambulance services in the past few months, also highlighted that the hospital was now facing other major issues: power interruption and dirty water flowing from its taps!

“We are facing a real dilemma here in Daro Hospital. Firstly, our water supply to the hospital is very unhealthy for consumption. And secondly, our power supply is always interrupted which could be dangerous to the patients in the hospital,” said the source.

As for the dirty water, the source added that it was supplied to other consumers in the district as well for quite a while already, seemingly without any solution in sight.

“As for the power supply, it is also a long outstanding issue faced by the patients. I was told that there is a back-up generator but the power has always been insufficient for the whole hospital,” said the source.

On a related issue, the source added that patients from Daro Hospital could be transported by the hospital boat ambulance which would reach Sibu Hospital after a journey of about two and a half hours.

“That would be the case if the ferry services stop at 10pm,” added the source. And after 10 pm, Daro would be completely like an island after all the ferry services stopped.

There are three ferry crossings to and from Daro; one crossing Batang Igan to Mukah and crossing Ng Kecil and Sg Serdeng to Sibu. All ferry crossings would take at least an hour. The services normally start at 6am.

Meanwhile, state health director Datu Dr Zulkifli clarified that Daro Hospital would not have to bear the expenses incurred by private van owners who had been providing temporary transport services to the hospital in the past few months.

He said this was because all expenses would have to be borne by the contract company concerned which had been providing ambulance services to the hospital.

Dr Zulkifli made the clarification after it was highlighted by the concerned citizen last Sunday that the contract company only paid for the first trip to Sibu and not the second and subsequent trips, which cost RM500 per trip.

Read more: http://www.theborneopost.com/2015/05/26/daro-hospital-in-endless-predicament-now-power-and-water/#ixzz3bcVXrX4P

Thank you for the road, say Ulu Skrang villagers

Thank you for the road, say Ulu Skrang villagers

by Matthew Umpang, reporters@theborneopost.com. Posted on May 24, 2015, Sunday
LUBOK ANTU: Ulu Skrang villagers are grateful for the Gawai Dayak gift of Ulu Skrang road, thanks to a budget allocated by the federal government.

Construction on the RM38 million 50 km gravel road started in 2012. Infrastructure Development and Communications Minister Dato Sri Michael Manyin Jawong said at the recent state legislative assembly that the road was 92 per cent complete.

Interviewed during a function at Darai, Ulu Skrang, the villagers said the long-awaited road had long been on their wish list, and they thank their assemblyman Dr Johnical Rayong Ngipa for it.

They said the road enable their relatives and family members to drive home to Ulu Skrang for Gawai Dayak. The only thing left are the bridges linking the roads but work has started on them.

Nudong Lias, who is a village headman (tuai rumah) of Nanga Murat longhouse said: “Rayong has done so much for my people which proves he cares for their well-being. I’m glad we voted for him,” he added.

Jelanie Renggan who is Darai longhouse tuai rumah said the people in his area were already celebrating.

“We used to walk for two to three hours to or from Murat longhouse (nearest settlement from their area near the main road) to travel outside Ulu Skrang. Now it only takes us half an hour go to Nanga Murat by car,” he said.

Velly Rabong, who is tuai rumah of Sungai Pinang longhouse, Ulu Skrang said bridges in the area would be the icing on the cake.

Rayong who officiated and attended the function in Darai said he was repaying the faith the people had in him by electing him a representative a few years ago.

Read more: http://www.theborneopost.com/2015/05/24/thank-you-for-the-road-say-ulu-skrang-villagers/#ixzz3bcUhTa00

More whys on shocking reveals3052015



More whys of shocking reveals 30/5/2015
Who is the contractor of the said company supplying electricity from generators to these 14 schools?

In regarding to the electricity supplier to the 14 rural schools, I want to know why the allocation RM21million is not to be given to that 14 schools directly.  In this way, each school can have RM1.5million to contract or buy its own generator at will. 

RM1.5million for two years to pay for the expenses related to electricity should be many times more than enough.  It is time the principals and staff to ask for the fund to be delivered to the school and let the school tackle this problem themselves. 
It is a shame to say that we have the Bakun dam and yet the electricity is not supplied to these rural schools.
____________________________________________________________
“Thank you for the road, say Ulu Skrang villagers”(The Borneo Post) It is RM38million allocation to construct 50km road.   But it is only gravels paved, imagine!  It is RM760,000 per km but it is only paved with gravels!  But the fools are still so thankful for such a poor product. 

What can you expect if you can accept anything of any quality without question?  It is the problem of the people being so foolish so are treated as fools.  It is time to be more responsible for any allocations to your area and demand the quality product.

It is also the time to ask for the development funds to the area to be given to the locals.  If having RM760,000 per km, I am confident that the villagers can build tar-sealed road of the superb quality and you still have the excess for maintenance for many years after deducting the expenses.  The locals, definitely, with the direct interest,  will spend wisely solely for the construction of the road truly reflect their sincerity and faith for the well-being and welfare of the area.

Building 50km length of road, the funds should be given to at 20 companies organised by the locals residing in the areas concerned.  It should never be given/tendered to one or two companies only not involving the local people at all.

By involving the locals in the project, we can ensure the allocation funds are well-guarded and rightfully used and there is no chance of money being pick-pocketed by any political thugs easily.

It is also a time to flush out all the abusive, corrupt and irresponsible representatives who are only interested in winning the election.

The lament of Song

The lament of Song

Posted on May 24, 2015, Sunday
A beautiful but sad Song.
IT is a beautiful but sad Song.
This township in the Central Region has a beautiful name. And as the name suggests, it is a jewel, one that should rightly be sparkling with day-long vibrancy, but is not, at deltas of two tributaries of the mighty Rajang — the Song River and Katibas River.

Sitting by Song Wharf, one is amazed by the natural beauty of the riverine town with longboats of different colours coming and going as gracefully as tropical fishes swimming freely among the reefs and the rocks beneath the waves.

The town may be small — no more than a few rows of old and new shops — but there is a hive of activities there in the morning, being the commercial centre, serving about 150 longhouses within the Katibas constituency in Song District.

However, come afternoon, especially after four when the last express-boat departs the wharf, the town gradually winds down to a standstill. After the last expressboat leaves, Song is cut off from the rest of the world. There is no connecting road to even the nearest town. The jewel loses its lustre.

It is now the 21st Century but Song still depends solely on the Rajang to link up with other towns such as Kapit, Kanowit and Sibu.

Though an inland town, it is really more like an island. Sadly, after 50 years of independence, Song is still trapped in a time warp. This is the reality the townsfolk have been living with all this time.

According to a local resident Toh Tze Hua, Song, in general, has remained in the doldrums not only in terms of overland transportation but also other aspects of development.

Toh, born and raised in Song, can vouch for the stagnation of development in the town.

“Nothing has changed. Song has been the same from my young days till now, except that two rows of shophouses are coming up. But they are the outcome of private initiative,” he told thesundaypost.

Toh noted that while development of other towns was taking off, Song had been completely left out of the state development plan.

The residents find this disappointing and frustrating, saying their area has always been a stronghold of the Barisan Nasional but never rewarded for their loyalty.

There are in total 8,542 voters in Katibas constituency.
The Ibans make up 91 per cent, the Chinese, four per cent and the Malays, four per cent.

For 2011 state election, only 5,378 voters turned up to cast their ballots and BN state assemblyman Datuk Ambrose Blikau garnered 3,326 votes to win the seat.

“Year after year, we have been supporting BN. But what have we got in return? We don’t even have a proper road, linking the town with the sub-urban area,” Toh said, pointing out that the road (Jalan Takan) connecting Song to its hinterland is still gravel-based.

Toh, a former councillor and businessman, believes to hasten development, it is important for Song to be linked physically to other parts of the state.

Presently, Sibu is already connected to Kanowit, and from there to Ngemah, by road.

It is only 14km from Ngemah to Song and a road connecting them was under construction but it suddenly stopped after 7km was completed.

Toh and many other longhouse residents hoped this road could be completed as soon as possible, especially now that RM500 million has been pumped into rural development.

“What we want is connecting with the rest of Sarawak by road — not total reliance on river transport,” Toh said.
The horrible state of the road linking Song and Ng Miaw.

Atrocious road condition
Meanwhile, the villagers of Ng Miaw, a settlement of three longhouses, have been lamenting the atrocious condition of the link road between Song and their village.

Coincidentally, the road is also 14km long but it is in such a horrible state that vehicle owners avoid it unless they have absolutely no choice.
“The road has been damaged by some quarters since five to six years ago.
We have been requesting for repair but so far, nothing has been done.
“Many of our youths working in peninsular Malaysia or other parts of the world, are disappointed to find the road still in utter disrepair when they return to celebrate Gawai every year.

“My granddaughter, a kindergarten school teacher, bought a new car and it had a puncture after being driven on that road for only a month.

“No one dares use the road when it is raining. We can only use it during dry days and even so, we are risking our lives and damaging our cars. It’s a very dangerous road to travel on,” said 70-year-old Dengon Gol, a resident of Rumah Jala in Ng Miaw.

What Dengon said is quite true.
A trip to the settlement on this road (if you can call it a road) takes over 45 minutes although the distance is only 14km. With big cracks, potholes, eroded uneven surface and steep gradients, the road is not for the faint-hearted.

Bad roads, or the lack of road connectivity, is not the only bane to the socio-economic well-being of Song’s folk.

Education is another sad song the people are singing — ever louder with each passing day not out of design but a deep sense of despair and abandonment.

For example, the skeletal structure of the unfinished SMK Song II, stands exposed to the elements, serving as a poignant reminder to the locals of their own plight.

The RM24 million project started in 2013 and scheduled for completion by 2014 but construction was abruptly halted last December.

According to Toh, the project has been left idle since due to high transportation costs.

“The only way to transport building materials from Sibu to Song is by river. You can imagine how expensive that is,” said Toh, a building contractor himself.
The abandoned SMK Song II.
Other neglected projects
SMK Song II is not the only abandoned government school project. The agriculture sub-station at Nanga Engkuah is another project left to its own fate — like Song itself.

And a few hundred metres from SMK Song II is the Song Fire Station. The latter, like the school, was abandoned for a while but construction resumed recently.

Then, there is the sad episode of ‘cannot do without’ dependence on generators for power by Song’s schools.

Sixteen primary and secondary schools are found in Song District, of which 14 are rural schools and still at the mercy of generators for their lightings.

A company has been contracted to maintain the generators but they frequently fail to work for days or even weeks before remedial action is taken.

When the generators are down, the students just have to put up with living in pitch darkness at night and drinking murky water during the day (as power is needed to treat and purify drinking water in the school).

The most recent case was SMK Katibas which suffered an almost power meltdown from April 24 to May 9. It was after a 16-day lapse that power was finally restored. Not surprisingly, the student population has since dwindled from 350 to just over 20.

What was painfully ironic was that the responsibility for repair did not lie with the contractor but the school authority itself.

While SMK Katibas was engulfed in pitch darkess at night, it was rumoured that a primary school in a more remote area was facing the same problem. However, due to the lack of information, thesundaypost was unable to locate the school.

Uproar among parents
Constant electricity failure at SMK Katibas has created an uproar not only among parents in Song but also those in other parts of the state after the situation came to light.

Questions were raised about the company which was given RM21 million to maintain the generators of all the 14 schools for a period of two years.
The authorities concerned were urged to look into the matter to ensure failure to avert an avoidable situation like SMK Katibas’ would not be repeated.

Another education issue in Song is SK Nanga Musah, built in 1963. Due to multiple factors such as soil erosion and unsafe building, the students had to be relocated to SK Nanga Nyimoh 13 years ago.

Since then, parents of SK Musah students have been sending their children to SK Ng Nyimoh, an hour boat ride from Ng Musah.

Ng Musah longhouse headman Philip Geliga said there are 10 longhouses in the area and about 100 primary school children from there have been studying at SK Ng Nyimoh.

From Philip’s longhouse alone, there are at least six children attending SK Ng Nyimoh.

“There is no road connecting Ng Musah and SK Nyimoh. We can only send our children to SK Nyimoh by boat and it is about an hour boat ride from Ng Musah. It’s expensive for us to send our children there and pick them up on weekends.Since a site has been identified and cleared for the construction of SK Ng Musah, we hope the project can start as soon as possible. Please don’t neglect us,” Philip pleaded.
(From right) TR Ingong Garai, TR Kujau Budon, Gasing Untam and TR Ebin Lagak.

Increasing disillusionment
From education, Philip moved on to politics. It is another subject that frustrates and angers the people when brought up.

Like many of the locals, Philip is getting increasingly disillusioned that even though Song has an elected representative for the past 35 years, there seems to be no proper plan to develop the area.

He called for a stop to the practice of ‘pilih kasih’ (bias allocation).
“Funds for minor rural projects (MRP) are given to 10 doors in a longhouse while the other 10 doors are left out. This has created a lot suspicion and animosity,” he claimed.

The predicament of Philip’s longhouse is shared by the headmen of the other longhouses.

TR (tuai rumah) Ingong Garai, TR Kujau Budon, Gasing Untam and TR Ebin Lagak all spoke of experiencing the same unfair treatment.

“We just cannot understand why this is being done. Our longhouses are split into two factions. There is jealousy, suspicion and distrust under the same roof.And this is really bad for us,” Kujau said.

Though much nearer Sibu, Song is significantly less vibrant than Kapit and less developed as well.

It is understandable that the townsfolk are feeling neglected and unwanted. Resentment has been mounting as shown by the dwindling majority for the elected representative in the area during the election over the past decade. It is time for the authorities to step in and look into the plight of Song and its people.

Read more: http://www.theborneopost.com/2015/05/24/the-lament-of-song/#ixzz3bcRAgAxC

























Friday, 29 May 2015

Billions promised, but Sarawak schools still in sorry state

Hornbill Unleashed

May 29, 2015

Billions promised, but Sarawak schools still in sorry state

Filed under: Politics — Hornbill Unleashed @ 8:01 AM

Entry into the teaching degree programme (PISMP) has been stringent as candidates must obtain five outstanding results in Sijil Pelajaran Malaysia (SPM) to be eligible to take the teacher qualification test (UKCG), and seven to join Program Pelajar Cemerlang (PPC).

But Deputy Prime Minister Muhyiddin Yassin thinks this is not enough. He said there is a need to use the psychometric test when recruiting new teachers.

This, according to him, will ensure PISMP and PPC candidates will graduate with a high knowledge discipline involving the physical and spiritual aspects.

“I wish to urge the Education Service Commission (SPP) to have a personality assessment through the psychometric test for all teaching graduates as an initial screening in their appointment process,” he told participants of the 2015 Education Service Conference in Miri, middle of May.

The Education Minister seems to think Malaysia’s education is what it is today because our teachers didn’t undergo the psychometric test.
Or that the standard of our education could have been better if theteacher recruitment process had included the psychometric test.

Didn’t someone tell him many schools in Sarawak, especially the rural ones, are in a sorry state?

Or that we have been talking in different wavelengths, and the Education Minister has missed the whole point?

Whichever the case, psychometric test is the least of Sarawak’s problems. Its problem is teacher shortage.

Beginning of the year, the Education Ministry said it would relax conditions to recruit trainee teachers from Sarawak so that more Sarawakians can serve in their home state.

In fact, it was Muhyiddin himself who talked about increasing the number of trainees from the state at teachers training institutes (IPGs).

“If the current number of Sarawakian teachers posted to the state is only 10 to 15 per cent of the total number of educators, the ministry would increase this percentage in stages,” the Education Minister was quoted as saying.

If, however, psychometric test is introduced, it only adds to the difficulty of meeting the need for more teachers.

Of course, our major drawbacks are overcrowded schools, rotting school buildings, computers and equipment that don’t work because there is no electricity (the generators broke down) and no Internet service.

Earlier in the year, Sarawak Teachers’ Union (STU) president Jisin Nyud was hoping that 2015 would have the answers to critical issues faced by Sarawak’s schools – the slow progress in repairing dilapidated and old school buildings, and upgrading facilities like the Internet.

“By the end of 2013, critical repairs and upgrading should have been completed across 1,608 schools. However, towards the end of 2014 how many schools in Sarawak have been repaired or upgraded?” Jisin had asked.

We are halfway through 2015, but similar problems still persist, which is why we get to hear of the malfunctioning power generators of SMK
Katibas, which pushed students to extreme inconvenience – having to grope in total darkness at sundown and put up with hot and stuffy classrooms during the day.

That’s not all. Without electricity, the pumps cannot draw water from the Katibas River to the boarding school. The toilets cannot be flushed and there is no water for bathing and cooking.

To Sarawak PKR vice-chairman See Chee How, the case of SMK Katibas is one of neglect on the part of the federal government for schools in Sarawak:

“Last year, in the Sarawak State Assembly, we were informed that the state Education Department had made 230 applications for infrastructural upgrading, improvement works and facilities for schools under the first, second and third rolling plans (2011-2014) costing RM4.59 billion. But only five projects were approved.

“We were also told the federal government had approved RM449.773 million for 751 schools needing repair, renovation or reconstruction.

“The deputy prime minister had, on revealing the National Education Blueprint 2013-2025, said all schools in Sarawak and Sabah are given priority for infrastructural upgrading and improvement work and be fully equipped with facilities before the end of 2014.”

It’s most regrettable if SMK Katibas is not among the 751 schools to be repaired, renovated or reconstructed. How many more are not in that list?
Or rather, have they really started the repair, renovation or reconstruction?

And what about the SMK Serian II that was approved under the Ninth Malaysia Plan (9MP)?

Land acquisition and compensation had been commissioned, yet the project hasn’t commenced.

And while the federal government sits on the project, the current SMK Serian, built in 1964, is crowding together about 2,500 students into several old and dilapidated buildings.

Have we got the wavelength right, now? For how long are we going to talk about the same old thing, and nothing done?   — JIMMY ADIT